You have been hired as a consultant for Ohio Gas & Electric (OHG&E) and your role is to minimize the costs associated to an upcoming project. The map on the next page is a section of a U.S Geographical Survey Contour Map of northeast Ohio with wetland (swamp) area outlined for clarity. An existing terminal is located at point B. If a new terminal is to be installed at point A, help OGH&E determine where to lay connecting pipe.
Given Information
The following information is provided by the company:
• Straight, two-inch coated pipe must be used at a cost of $1.50/ft
• A maximum of two elbow joints may be used. Assume that the elbow joints may be fabricated with any angle measure.
• In crossing normal terrain, installation cost is $1.20/ft
• Installation in the wetland area requires an addition Track Hoe at a cost of $60/hr
• In a 10-hour day, a Track Hoe can dig approximately 300 feet of trench.
Questions to Answer
Determine the pipeline route connecting the new well at C to the well at D which incurs the least cost.